•Public Notice Number : Ulju-gun, Ulsan Metropolitan City Public Notice No. • Aticle 25 of the Environmental Impact Assessment Act and Article 43 of the Enforcement Decree of the same Act, the results of the environmental impact assessment (draft) for the Korea FloatingWind and East Blue Power offshore wind projects, and the results of collecting… KFW/EBP Opinion Surveys and Application Results on Environmental Impact Assessment 계속 읽기
한국부유식풍력㈜ / 이스트블루파워㈜
Korea Floating Wind Co., Ltd. / East Blues Power Co., Ltd.
44726, 울산 남구 삼산로 182, 보림타워 16층(남구 달동 117-4)
T. 052-227-5400 F. 052-227-5401
E-mail. Info@koreafloatingwind.kr
Bolim Tower 16FL, 182 Samsan-ro
Nam-gu, Ulsan, Republic of Korea (44726)
☎ +82-52-227-5400 | (Fax) +82-52-227-5401
(E-mail) Info@koreafloatingwind.kr
© Copyrights KOREA FLOATING WIND Power Co., Ltd. All rights reserved.
© Copyrights KOREA FLOATING WIND Power Co., Ltd. All rights reserved.