KF Wind has successfully completed the geotechnical survey for the East Blue Power site, the first phase of its development, corresponding to 375 MW of the entire 1,125MW floating offshore wind project.Geo Mariner, a specialized geotechnical survey vessel, conducted the survey for approximately one month to obtain essential technical and environmental insights for the successful… KF Wind completes Geotechnical Surveyfor the first phase of the 1,125MW floating offshore wind project 계속 읽기
한국부유식풍력㈜ / 이스트블루파워㈜
Korea Floating Wind Co., Ltd. / East Blues Power Co., Ltd.
44726, 울산 남구 삼산로 182, 보림타워 16층(남구 달동 117-4)
T. 052-227-5400 F. 052-227-5401
E-mail. Info@koreafloatingwind.kr
Bolim Tower 16FL, 182 Samsan-ro
Nam-gu, Ulsan, Republic of Korea (44726)
☎ +82-52-227-5400 | (Fax) +82-52-227-5401
(E-mail) Info@koreafloatingwind.kr
© Copyrights KOREA FLOATING WIND Power Co., Ltd. All rights reserved.
© Copyrights KOREA FLOATING WIND Power Co., Ltd. All rights reserved.